Our Services
Polyurethane concrete lifting
We use a simple 3 step
- Drill. We drill a small 5/8 hole. 
- Pump. We inject our NCFI polyurethane foam powered by poly pier underneath the slab filling and raising the concrete slab. 
- Patch. We fill the 5/8 holes back with concrete. 
 
                        